Incentives in new product development projects and the role of target costing

Author: Mihm, Jürgen INSEAD Area: Technology and Operations ManagementIn: Management Science, vol. 56, no. 8, August 2010 Description: p. 1324-1344.Type of document: INSEAD ArticleNote: Please ask us for this itemAbstract: This paper investigates how self-optimizing engineers affect new product development (NPD) project outcomes and development times. A variety of widely used NPD project management approaches, including heavyweight project management, may allow or even encourage engineers to introduce late design changes and exhibit weak cost compliance, reducing the product’s profit or competitiveness. Providing specifically designed incentives for individuals can eliminate such encouragement, and thus improve cost compliance and project timeliness. This paper discusses several practical incentive schemes, including profit-sharing contracts and component-level target costing. For many industrial projects, component-level target costing makes the most efficient use of available information to optimize project outcomes and reduce development times
Tags: No tags from this library for this title. Log in to add tags.
Item type Current location Call number Status Date due Barcode Item holds
INSEAD Article Europe Campus
Available BC009193
Total holds: 0

Ask Qualtrics

This paper investigates how self-optimizing engineers affect new product development (NPD) project outcomes and development times. A variety of widely used NPD project management approaches, including heavyweight project management, may allow or even encourage engineers to introduce late design changes and exhibit weak cost compliance, reducing the product’s profit or competitiveness. Providing specifically designed incentives for individuals can eliminate such encouragement, and thus improve cost compliance and project timeliness. This paper discusses several practical incentive schemes, including profit-sharing contracts and component-level target costing. For many industrial projects, component-level target costing makes the most efficient use of available information to optimize project outcomes and reduce development times

Digitized

There are no comments for this item.

Log in to your account to post a comment.
Koha 18.11 - INSEAD Catalogue
Home | Contact Us | What's Koha?